Pick a ENGINEERING problem statement (like in attached presentation but not same

Pick a ENGINEERING problem statement (like in attached presentation but not same) and complete the project. Provide report and presentation. Attached is the sample of project presentation and report on what is exactly expected. I need all the analysis done from the presentation.

im almost done with my project and i just need help with a two examples my proje

im almost done with my project and i just need help with a two examples my project is on Reliability Analysis in Healthcare Systems, i need you to solve two problems in any healthcare system or machines
below i will link my course slides, i need the questions solved the same way as the slides below using the same methods and quotations format found in the examples section but it needs to be in health care systems or machines.
my course slides :

Create a presentation following the sample that highlights key aspects of the at

Create a presentation following the sample that highlights key aspects of the attached project proposal, emphasizing its relevance to our pharmaceutical industries. Ensure to provide a notes to speak about clear vision of how the proposed strategies align with our organizational goals and contribute to our success within the dynamic pharmaceutical landscape.”

Instructions: 1- Find the parts families using DCA. 2- Perform assembly line bal

Instructions:
1- Find the parts families using DCA.
2- Perform assembly line balancing for alternative designs in each cell.
3- Perform assembly line balancing for subassemblies (if applicable)
4- Determine multi-product assembly lines in each focused unit
5- Identify manufacturing cells (dedicated lines, dedicated cells, shared cells, remainder
cells, etc.) considering each focused unit and all focused unit
6- Draw all the cells, lines, assembly lines (with machines/stations) and show material flow.
1)When performing assembly line balancing consider utilization which can be used to decrease the number of stations
2) some subassemblies will need to be considered for multiproduct
A sample is also attached for single product design. This question needs to convert it in multiple.

Instructions: 1- Find the parts families using DCA. 2- Perform assembly line bal

Instructions:
1- Find the parts families using DCA.
2- Perform assembly line balancing for alternative designs in each cell.
3- Perform assembly line balancing for subassemblies (if applicable)
4- Determine multi-product assembly lines in each focused unit
5- Identify manufacturing cells (dedicated lines, dedicated cells, shared cells, remainder
cells, etc.) considering each focused unit and all focused unit
6- Draw all the cells, lines, assembly lines (with machines/stations) and show material flow.
1)When performing assembly line balancing consider utilization which can be used to decrease the number of stations
2) some subassemblies will need to be considered for multiproduct

this project would be done using Arena System simulation and I would need the do

this project would be done using Arena System simulation and I would need the doe file and a Word document explaining the work. can you do that
an select any part of Amazon’s process and make a complete simulation (including animation). Examples are 1) a Broad picture of the Delivery system, 2) the Returns process, 3) Last-mile deliveries, 4) the Warehouse picking system, etc.
Students select one part and will do the simulation assuming ALL they need (arrivals, services, routes, etc…). Run appropriate statistics. Please search on the web to get more information about the part of the process you are working on; outputs must be credible and associated with actual times (I am assuming that you, as final users, know something about the process and delivery times)