Hi, I need a report
on how to improve this kind of building
starting from insulation external and internal to the little things like lights, ventilation, roof, triple/double glaze vacuum 100mm windows, etc
I attached the picture for you
I need to improve everything about this building
please use pictures from the U-value calculator: Rockwool-king spanalso, recommendation, table of contents, Harvard 2008,
thank you
Let me know if you need more information
Category: Construction
The textbook has dedicated substantial space to discussion of on-site water tre
The textbook has dedicated substantial space to discussion of on-site
water treatment (as well as sewage treatment and power generation).
There is almost no discussion of public utility water supply systems.
Why do you think this is so? What responsibilities, if any, does the use
of such public systems place on a building designer? Give examples in
your response post.
As construction managers, we will be considering the overall impact of projects
As construction managers, we will be considering the overall impact of projects on the environment. We need to manage stormwater runoff, the EPA, geotechnical surveys, the integration of building controls, and much more!
What do sustainability, concepts like green development, LEED certification, and net-zero buildings mean to you?
Given the significant impact of the construction industry on the global economy, should additional sustainability regulations be introduced?
Where do you believe the most attention should be focused to minimize the environmental impact of ongoing projects?
FORMAT: Answer each question below. Your answer will be graded on correctness an
FORMAT: Answer each question below. Your answer will be graded on correctness and completeness.
BACKGROUND INFORMATION: You are the project manager at ABC Construction. You have been out of school for 5 years and up until now you have been a project engineer. The Sr. Project Manager is turning this project over to you. The Senior PM wants to make sure you are ready to handle this project so he or she is asking the following questions for you to answer.
You are responsible for overseeing the construction of a 10,000 square foot commercial office building in the City of Phoenix. The total contract price is $5,500,000.00. The soils report shows rock at 5 feet below existing grade. You excluded hard dig from the bid submitted to the owner.
During the contract negotiations, you asked the Owner to include ABC Construction’s low bid as part of the contract. The Owner refused. The scope of work reads as “construct building per approved construction drawings”. You excluded underground storage tanks, hard rock, architecture, sales tax, building permits, and all underground utilities from your bid. The agreement provided by the Owner for the project includes the following language:
Contractor represents and warrants to the Owner: (1) that Contractor is duly licensed in the state where the work will be performed, (2) that Contractor was given a reasonable opportunity to review the project site before entering into the construction contract and has determined through its own investigation that the Contract Price represents a fair and reasonable amount to be paid for by the Owner for the construction of the project, and (3) that Contractor is a professional and will perform all work in a workmanlike manner.
The Architect who designed the building is from Orcutt Winslow. You have never worked with them before. The project is being managed by CBRE. CBRE is managing the project on behalf of the project owner. This is your first time working with CBRE.
The project was awarded on a low bid basis. The five primary subcontractors you will be using for this project are:
Suntec Concrete (Tilt Panel & SOG) – $1,016,000
Manny’s Air, LLC – $653,000
Plumbing (this is a plug number) $432,000
Haskin’s Electric – $789,000
SoCal Excavating (Earthwork, Utilities, Paving) – $268,000
The project will be financed by JPMorgan Chase Bank. The lender is insisting on at least 30 days to review each payment request. This means payment may be processed 45-days after you turn in a payment application. The lender has also asked that no contractors serve 20-Day Preliminary Lien Notices for the project. A 20-Day Preliminary Lien Notice is the first step to enforce your mechanic’s lien rights. If subcontractor does not take this step, they will not be able to enforce a lien against the property. If the construction loan is not converted to permanent financing within 12 months, the owner will be required to extend the loan, which may cost the owner additional money.
The end user for this building will be Microsoft (it will be used as a local call center). Microsoft has a local construction manager that will be at the jobsite at least 1 time per week.
QUESTIONS:
Identify the top three risks concerning the subcontractors selected for this project (10 points each):
2. If the Owner refuses to include ABC Construction’s bid as a contract document, is that a problem for ABC Construction? Yes or No? Explain your answer (10 points).
3. Who should pay for the hard dig costs? Explain how you intend to address the hard dig exclusion with the owner (10 points)?
Identify 3 potential risks concerning the fact that we have never worked with Orcutt Winslow and the fact that the Owner’s Representative (Microsoft’s Construction Manager) will be onsite 1 time per week (10 points).
5. Will you be able to accept the requirements imposed by JP Morgan Chase on this project? Explain your answer (10 points).
Good day i have a sketching asignment , that comprises of line , verticle and ho
Good day i have a sketching asignment , that comprises of line , verticle and horizontal lines along with shes and others .
Some Rubric (6) CriteriaRatingsPts This criterion is linked to a Learning Outcom
Some Rubric (6)
CriteriaRatingsPts
This criterion is linked to a Learning OutcomePart 3.1 – INDUSTRY CHALLENGESIdentify 2-3 key construction industry challenges from the report.
10 pts
This criterion is linked to a Learning OutcomePart 3.2 – USE CHAT GPTWrite two (2) different prompts that you could use to ask ChatGPT to be able to help you identify construction industry problems.
20 pts
This criterion is linked to a Learning OutcomePart 3.3 – COMPARE AI VS. “YOU”Describe in 2-3 sentences how similar/different Chat GPT identified vs what you read/summarized.
20 pts
Total Points: 50pts
PLEASE MAKE SURE TO READ THE INSTRUCTIONS CAREFULLY PLEASE
this class is a constuction class concrete construction for contractors. please
this class is a constuction class concrete construction for contractors. please view and review the question carefully and make sure all answers are correct please and submit it in excel thanks.
In this week’s module, you will find an electrical lighting plan and a lighting
In this week’s module, you will find an electrical lighting plan and a lighting fixture schedule.
Examine the lighting plan closely and provide a take-off for the most common lighting fixture on the plans and one other lighting fixture of your choice. To do this, Google each fixture. Decide on your choice of supplies and cost per unit.
Create an Excel spreadsheet that lists the fixture ID, cost per unit, tax, and overhead (10%) for each selected fixture, and then provide a total for the chosen items. This spreadsheet should include the formulas for the extended costs.
In your post, attach a copy of your Excel spreadsheet and reflect upon the process you used to calculate this takeoff. Specifically, address:How did you arrive at this conclusion?
Where do you feel you did things correctly?
Where did you experience trouble?
Why did you experience trouble?
Some Rubric (6) CriteriaRatingsPts This criterion is linked to a Learning Outcom
Some Rubric (6)
CriteriaRatingsPts
This criterion is linked to a Learning OutcomePart 3.1 – INDUSTRY CHALLENGESIdentify 2-3 key construction industry challenges from the report.
10 pts
This criterion is linked to a Learning OutcomePart 3.2 – USE CHAT GPTWrite two (2) different prompts that you could use to ask ChatGPT to be able to help you identify construction industry problems.
20 pts
This criterion is linked to a Learning OutcomePart 3.3 – COMPARE AI VS. “YOU”Describe in 2-3 sentences how similar/different Chat GPT identified vs what you read/summarized.
20 pts
Total Points: 50pts
PLEASE MAKE SURE TO READ THE INSTRUCTIONS CAREFULLY PLEASE
this class is a constuction class concrete construction for contractors. please
this class is a constuction class concrete construction for contractors. please view and review the question carefully and make sure all answers are correct please and submit it in excel thanks.