The objective of this project is for each group of 3-6 students to prepare a pro

The objective of this project is for each group of 3-6 students to prepare a proposal and quotation for a construction project based on the provided documents. The project includes the following tasks:
Study the project’s bill of quantities (BOQ) and any other provided documents.
Prepare a proposal and quotation for the project.
Give a presentation of the proposal and quotation to the class.
The proposal and quotation should include the following information:
A detailed scope of work and technical background of your firm
The project cost and payment schedule
The construction timeline
The project issues and dispute resolution process
Presentation: The presentation should be no more than 10 minutes long. The group should cover the following topics in their presentation:
The project’s background
The group’s proposal and quotation
The benefits of the group’s proposal and quotation

Following the Work Breakdown Structure Homework Sheet below, complete and then u

Following the Work Breakdown Structure Homework Sheet below, complete and then upload your outline and activities.
To receive full points, you must:
a) develop a WBS with at least 3 levels (10 pts),
b) your WBS captures all project scope elements (10 pts) and
c) identify a preliminary list of activities needed (10 pts)

Part 1: SWPPP Using the Gobernadora Basin Plan sheet (found under Assignment 2)

Part 1: SWPPP
Using the Gobernadora Basin Plan sheet (found under Assignment 2) and the information below answer the following questions.
Given:
Project: Gobernadora Multipurpose Basin
Schedule: Start 9/27/14, End 5/30/15
Location: Latitude= 33.55777, Longitude: -117.58861
Determine the Risk Assessment for project site.
Question: Identify the rainfall erosivity factor (R) and fill in the answer below. NOTE: Provide screenshots of the Caltrans website where this information is pulled from for full credit on the assignment.
Identify the soil erodibility factor K.
Determine the site slope length/gradient Factor LS.
Calculate the sediment risk factor in tons of sediment/acre.

HANGING SCAFFOLD – USE THE INFORMATION BELOW TO SOLVE THE FOLLOWING PROBLEMS. Th

HANGING SCAFFOLD – USE THE INFORMATION BELOW TO SOLVE THE FOLLOWING PROBLEMS.
This problem is based on the hanging scaffold in Figure 1, with two working decks. Assume medium duty loading. There are two outrigger beams and they are A36 steel, 20 ft long and are as shown in the sketch below. In addition to the live load, include in your calculations, a total scaffold dead load (weight of the cables, scaffold and scaffold hoists) of 1400 lbs. The scaffold length is 40 feet and the width is 4 feet. ONE of the outrigger beams will support half of these dimensions.
Determine the minimum breaking strength of the suspension cables, based on OSHA requirements.
Using your scaffold load, draw a neat free body, shear and moment diagrams of one of the outrigger beams. Determine all the values of all shear forces and moments. Make sure they are neatly displayed on the diagrams. Identify with boxed the value of the Vmax and Mmax.
Replace the scaffold load in Part b, with 7.5 kips and determine the minimum weight (yd3) and the minimum size (ft) of the counterweight, based on OSHA requirements. Assume the geometric shape of the counterweight to be a cube.
Ignore the answer in Part b, using a maximum bending moment of 100,000 lb-ft, select the most economical wide flange beam using the tables in Appendix 1 for the outrigger beams. Be sure the beam you select is stable, i.e. the depth should not be more than 1.25 times the flange width. Show all calculations in the PDF submittal.
Determine the live load on the scaffold in lbs.
Determine the minimum breaking strength of the suspension cables, based on OSHA requirements. Answer in lbs.
Using your scaffold load, draw a neat free body, shear and moment diagrams of one of the outrigger beams. Include in PDF calculation submission. Determine all the values of all shear forces and moments. Make sure they are neatly displayed on the diagrams. Identify the value of the Vmax = kips and Mmax = .kip-ft
HINT: Don’t include the directions of the V and M in the answer. Only the magnitude is required! Also make sure to keep rounding to two decimal places.
Replace the scaffold load in Part b, with 7.5 kips and determine the minimum counterweight load = lbs, minimum volume = (yd3) and the minimum size = (ft) of the counterweight, based on OSHA requirements. Assume the geometric shape of the counterweight to be a cube.
THIS PROBLEM STATEMENT APPLIES TO THE PROBLEMS THAT FOLLOW.
Ignore the answer in Part b, using a maximum bending moment of 100,000 lb-ft, select the most economical wide flange beam using the tables in Appendix 1 for the outrigger beams. Be sure the beam you select is stable, i.e. the depth should not be more than 1.25 times the flange width. Show all calculations in the PDF submittal.
Calculate the section modulus. Answer in in^3.
Select the most economical wide flange beam. Be sure the beam you select is stable, i.e. the depth should not be more than 1.25 times the flange width. Show all calculations in the PDF submittal.
Hint: First ensure that it meet and/or exceeds the strength criteria (S), then depth/width ratio <1.25, finally most economical section (least material/weight).

Answer the following questions with regards to the material learned in this Modu

Answer the following questions with regards to the material learned in this Module (SWPPP). (15 points)
Part 1: Using the Gobernadora Basin Plan sheet from HW2 – see attached (also in HW2) identify and locate on the plan sheet the following BMPs for the project site.
a. Sediment Control
b. Erosion Control
c. Tracking Control
d. Wind Erosion Controls
e. Non-stormwater Controls
f. Waste Management
Label accordingly and include in a PDF attached to the discussion post. Provide neatly drawn BMPs using the map provided. Use Bluebeam, Microsoft Paint, Google SketchUp or neatly draw them by hand. (15 pts)
Requirements: as the question states | .doc file

Answer the following questions with regards to the material learned in this Modu

Answer the following questions with regards to the material learned in this Module (SWPPP). (15 points)
Part 1: Using the Gobernadora Basin Plan sheet from HW2 – see attached (also in HW2) identify and locate on the plan sheet the following BMPs for the project site.
a. Sediment Control
b. Erosion Control
c. Tracking Control
d. Wind Erosion Controls
e. Non-stormwater Controls
f. Waste Management
Label accordingly and include in a PDF attached to the discussion post. Provide neatly drawn BMPs using the map provided. Use Bluebeam, Microsoft Paint, Google SketchUp or neatly draw them by hand. (15 pts)