STRUCTURAL DESIGN FOR INFRASTRUCTURE An open rectangular concrete tank sits at ground level and must be designed to contain sludge to an operational depth 0.7m below the top of the walls.

Learning Goal: I’m working on a civil engineering exercise and need an explanation and answer to help me learn. STRUCTURAL DESIGN FOR INFRASTRUCTURE An open rectangular concrete tank sits at ground level and must be designed to contain sludge to an operational depth 0.7m below the top of the walls. The internal dimensions of your tank are given in the table below. The base is 500mm deep and is assumed to provide a continuous edge restraint to the walls. The strength class of the concrete is C35/45 and cement containing 30% GGBS is specified. The tank will be poured in winter and formwork is not specified. Assume cover to reinforcement is 50mm. Your design must include: 1 . Structural design of the walls and base of the tank. 2. Check the adequacy of the wall reinforcement for early-age and long-term cracking. State all design assumptions that you make and reference all design formula. 3. Produce a neat hand drawn sketch of your tank to show dimensions and the required reinforcement. 4. Discuss the main issues relating to the construction of a liquid retaining tank such as the one you have designed, with particular emphasis on minimising crack formation (max 300 words)
Requirements: 300

You need to produce a preliminary summary construction method statement. The met

You need to produce a preliminary summary construction method statement.
The method statement should be including but not limited to:
a. Main materials & techniques
b. Methods
c. Site layout (Autocad or Hand Draw)
d. Major plant and equipment
e. Summary time schedule
The word limit is 1500 (+- 10%)

Task : Because of the building site is in a congested area, a steelwork temporar

Task :
Because of the building site is in a congested area, a steelwork temporary platform is needed for construction plants transporting excavated spoil materials and other construction materials and plants during the basement construction stage. Specific platform structural materials and site requirements are as follows:
(i) Plan working area of 10m* x 16m* for mobile crane and construction truck operations
(ii) Construction operation load of 30 kN/m2
(iii) Precast Grade 35 concrete panels of 2m* x 2m* for platform decking
(iv) Steel column spaced in grids of 5m* x 8m*
(v) Grade S275* steel for all steelwork sections
You are asked to produce the following temporary work design submission documents:
a) a suitable steel framing plan showing slab, secondary and primary beam and columns
elements;
b) structuraldesigncalculationsfortheprimarysteelbeammemberoftheplatformstructure.
c) structural design for a typical steelwork column which is 4.5 m tall fixed to a concrete
base.
Important Note:
Concrete and Steelwork Design shall comply with the Hong Kong Code of Practices for the Structural Use of Steelwork currently in force.

The topic is wind turbine (The tower of a wind turbine). Please thoroughly read

The topic is wind turbine (The tower of a wind turbine). Please thoroughly read through the instructions and what is required and let me know if you know how to do it.
there are sections in this assignment, however, I am assigned to write about the wind turbine tower. The sections are divided into 6 parts (explained in instruction and guidance attachment).
this a group work, nevertheless, everyone in my group has to do one part. I was assigned to do the wind turbine and talk SPECIFICALLY about the tower of wind turbine.
I will attach a worked example. please follow it accurately, it is an example of an oven (i wanted the same way). followed with the 6 sections i mentioned. do take a look on the way it was made. and strictly follow the format carefully.
Don’t hesitate to contact me if something was unclear. Also, whenever u finish a section please share it to me so I can know whether u did correctly or u missed something. If the task is confusing please contact me please. Follow the (WORKED SAMPLE) if something was not clear.
Things to write about the tower (optional for you):
-the height, the range of the air velocity for the blades to rotate.
– *minimum air velocity is 3 m/s and max is 25 m/s .. 12 to 14 are perfect velocity range.
-the tower is usually 80 m long but it depends on the tower capacity needed and the climate.
– it comes in vertical and horizontal blades, horizontal is the most common.
– material: steel iron and aluminium (mainly steel).
Please note that 500 words are enough, try to insert graphs and pictures instead. 🙂
Again the worked sample that i will attach is how i will expect it to. so please follow it accurately. I hope the sample make sense because i cannot paste the link it requires the universities email (private URL).
*the edupack link, CES Edupack, Granta Design Ltd (2012).
if you need access to anything let me know as soon as possible. Do contact my number +44 7951 528026 for any inquiries, don’t hesitate. 🙂
P.S. The sooner you finish the better. May i ask when are u available?

AECOM is the Fortune 500 company I have chosen for the topic of this research pa

AECOM is the Fortune 500 company I have chosen for the topic of this research paper. Fortune 500 company number #156
MGT 101 SWOT Analysis Requirements
The SWOT Analysis will be completed for a 2019 Fortune 500 Company. You will research and provide the strengths, weaknesses, opportunities, and threats, for your chosen company. This information will be paraphrased and placed in your own words. No quotations. One company per person. This must be YOUR original work. You cannot use previously submitted assignments by you or anyone. Do not recycle previously submitted documents completed in other courses, other semesters, or from other schools.
To get started, follow the instructions below in the order given:
1. View the 2019 Fortune 500 List, URL is https://fortune.com/fortune500/
2. Choose two companies for which to complete your SWOT analysis
3. Go to the BrightSpace/D2L Discussions forum and read through the companies previous
submitted/posted to avoid duplication.
4. Create your own message and place the company name in the SUBJECT field of your
post/thread by the deadline date in the Fortune 500 Company Choice Discussion Folder. Remember, the person that post the company first gets preference. You chose two companies so if the first company you chose was already selected use the other. If the 2nd choice is there, go back to the drawing board.
5. You may change companies as long as no one else has selected it. You must post your change BEFORE the deadline. Open and edit your original message if you decide to choose another company.
Now that you have selected the company of your choice, get started conducting the research.
References
Must have three (3) to five (5) unique reference articles/sources are required. References should be current; from 2018 to 2020. Use the TTC Management Library Guide for acceptable article databases. The URL is http://libguides.tridenttech.edu/business or select this link Management LibGuide . The company’s latest Annual Report can be one source. As a reminder blogs and Wikipedia are not acceptable references.
Analysis Format
Total of five (5) pages: Title Page (1st page), the Main Body (introduction and SWOT) and conclusion of the analysis (2nd, 3rd and 4th pages double-spaced pages), and the Works Cited/Reference (5th page). Please see template for the analysis requested format. No direct quotes. All content will be paraphrased and placed in your own words.
The Main Body which includes the introduction, Strengths, Weaknesses, Opportunities and Threats, and the conclusion can flow across pages. It is required to include at least three items under each. These should be given in complete sentences. Rubrics are provided to use to obtain the information to include for the SWOT. The last portion is the Conclusion. It is the outlook of the company based on the SWOT analysis.
You can use either MLA or APA documentation style for your Works Cited page—it is your choice.
The analysis must be typed using MS Word or compatible, double-spaced, 1-inch margins, using 12 pt font (Arial, Tahoma or Times New Roman). Check spelling, grammar, word flow, punctuation, etc. Cite all reference materials/URLs used.
1st page – Title page
2nd, 3rd and 4th pages – Introduction, Strengths, Weaknesses, Opportunities, and Threats, and conclusion
5th page – Works cited in APA or MLA format
SUBMISSION
Submit the assignment to the BrightSpace/D2L Assignments folder before the deadline. However, the integrated Turnitin application is automatic and submitting your first draft as soon as possible will give you the opportunity to review the originality report provided by the Turnitin application. Turnitin provides an originality report after you submit your document. It compares your submission with a database of previous submitted documents. This helps prevent you from innocently plagiarizing. If your originality percentage is more than 20%. Correct these areas of your paper by paraphrasing the matched text. Make sure you cite all references. You want to achieve a low percentage number, and preferably a blue color block. Any color or percentage higher than 20 will score a yellow or orange color block.
Once you have revised your paper, resubmit. A second originality report will be generated, which hopefully shows a lower percentage than the first submission. Continue to refine and resubmit your paper as many times as needed before the due date.
Please view the Sample SWOT Analysis, SWOT Rubric, SWOT Checklists

please find a sources that show the suitable for current traffic volumes between

please find a sources that show the suitable for current traffic volumes between gulf road and sharq mall area that located in kuwait city and i need you to calculate the traffic volumes of the gulf road and sharq mall area ( attached blow the formula) and the write a short paragraph that explain your work, please.

please find a sources that show the suitable for current traffic volumes between

please find a sources that show the suitable for current traffic volumes between gulf road and sharq mall area that located in kuwait city and i need you to calculate the traffic volumes of the gulf road and sharq mall area ( attached blow the formula) and the write a short paragraph that explain your work, please.

Learning Goal: I’m working on a civil engineering project and need support to he

Learning Goal: I’m working on a civil engineering project and need support to help me learn.This semester’s project is divided into two efforts. First, and the purpose of this project, is to develop a Request for Professional Engineering Services as an owner/operator of the project proposal. In this effort, your team will procure engineering services related to a project from one of the following possible work assignments in the civil engineering field:Structures: Supporting an architect who has designed a new five-floor office building with structural engineering services
It is anticipated that your team will select a project of relevance to your future career from the options of: public sector (e.g., state government agency, county, and/or municipality, etc.), private sector (e.g., professional services consultant and/or contractor, etc.), or non-profit (research institution and/or university, etc.). Regardless of your pursuit, establishing this procurement from an owner/operator perspective, will be the same.For purposes of this project, consider the following parameters.Project descriptions are purposely vague. It will be up to your team to provide context. Choose your location in the Phoenix metro area for the location of the project. Note the responsible municipality and/or state agency related to your project and in your Request for Services.
Assume the construction value for each of the projects to be between $15 million and $25 million. As a rule of thumb, consider the professional engineering services to represent approximately 10% of this budget.
PROCUREMENTS will be for professional services only, with follow up construction management and inspection services.
Research on-line for similar procurements; look at up to five different options, minimum (for this exercise, the more the better). Make certain all reference sites are identified, with weblinks, in an appendix to the written submittal noted below. In the September 9, 2021 class, the following examples were provided

Determine Doors Frames Hardware from the drawing(use bluebeam), and how you dete

Determine Doors Frames Hardware from the drawing(use bluebeam), and how you determine. If need more pages let me know
Determine the doors, frames and hardware needed to complete Rooms: 004, 006, 007, 008 and 017.
081101 Metal Doors and Frames 082100 Wood Doors
087100 Hardware
087110 Hardware

Determine Doors Frames Hardware from the drawing(use bluebeam), and how you dete

Determine Doors Frames Hardware from the drawing(use bluebeam), and how you determine. If need more pages let me know
Determine the doors, frames and hardware needed to complete Rooms: 004, 006, 007, 008 and 017.
081101 Metal Doors and Frames 082100 Wood Doors
087100 Hardware
087110 Hardware