Rewrite it by hand and in regular handwriting (preferably the handwriting is not good)I will send my
I want someone to copy my handwriting
The font must be similar to the font in the sent image, each file must be sent separately, and everything must be written and drawn.
Category: Civil Engineering
I need your support to provide me with the following: – Word format – Avoid pla
I need your support to provide me with the following:
– Word format
– Avoid plagiarism
– power point for presentation
for the subject of the :
Pavements management systems
I need a report that conforms to the attached standards and the minimum number of pages (22) and add the citation in the content and references at the end of the paper with reliable sources for the last 10 years (at least 15 references)
Make sure your report is organized (table of contents, table of figures, introduction, sections, conclusion and).
Be sure to follow all guidelines for style references and paper content and apply everything in the attached Word document
(((Follow the instructions and try to do it professionally in the submitted file)))
I need your support to provide me with the following: – Word format – Avoid plag
I need your support to provide me with the following:
– Word format
– Avoid plagiarism
—————————————————————————————
For the subject of
The Impact of Seaports on Coastal Erosion
need report with compliance of the attached criteria and minimum count of words”2500″, and adding the citation in the content and references at the end of paper with creditable sources for last 5 years “at least 10 references ”
Make sure your report will structured (Table of content, Table of figures , Introduction, sections , conclusion and references).
Make sure you follow all the guidlines for the references style and for the content of the paper
I need your support to provide me with the following: – Word format – Avoid plag
I need your support to provide me with the following:
– Word format
– Avoid plagiarism
—————————————————————————————
For the subject of :
Seaport Technology and Innovation
I need report with compliance of the attached criteria and minimum count of words”5000″, and adding the citation in the content and references at the end of paper with creditable sources for last 5 years “at least 10 references ”
Make sure your report will structured (Table of content, Table of figures , Introduction, sections , conclusion and references).
Make sure you follow all the guidlines for the references style and for the content of the paper
I’ve been assigned to work on a raft footing design and have completed both the
I’ve been assigned to work on a raft footing design and have completed both the PowerPoint presentation and the report. However, the professor has indicated that improvements are needed on the report, as this is my second attempt at submitting the same report.
I’ve been assigned to work on a raft footing design and have completed both the
I’ve been assigned to work on a raft footing design and have completed both the PowerPoint presentation and the report. However, the professor has indicated that improvements are needed on the report, as this is my second attempt at submitting the same report.
Energy Management and Performance Evaluation for non-demostic building (Collage
Energy Management and Performance Evaluation for non-demostic building (Collage building). Thise report include data in tow files (word document , Exl sheet) based in information given and require .All the informaton will be attache below .
Level surfaces are curved surfaces tangential to the horizontal plane at that po
Level surfaces are curved surfaces tangential to the horizontal plane at that point. Are horse piped water used in construction leveling perfectly Level?
Assignment must be in 3500 words must include 15 pictures or flow charts Assignm
Assignment must be in 3500 words
must include 15 pictures or flow charts
Assignment should be based on Section V – Procurement Methods and Supply Chain Matters (Student 5)
1.Select & justify the most appropriate procurement method for this project in terms of the contractual
obligations. Explore the implementation of the innovative collaborative procurement approach to derisk the construction.
What does procurement mean?
Procurement is the process of purchasing goods or services. There are many different routes by which
the design and construction of a building can be procured:-
Traditional
Design and Build
Partnering- and so on
Form of Contract :-
JCT
ICE 7th Edition
NEC suit- and so on.
How would a collaborative approach de-risk the construction.
Section V – Procurement Methods and Supply Chain Matters (Student 5)
2. Analyse the structure of the UK economic in terms of procurement methods & supply chain
matters and demonstrate a critical awareness of the economic role played by the civil engineering
construction industry.
Similar to the last question but centred around UK policies.
Can you reflect on any past companies where the wrong procurement methods have been used?
What is Supply Chain Management?
Who are the parties to it
What are the benefits of it.
How does Civil Engineering play an economic role within the system?
Would a flow- chart support this section?
Section V – Procurement Methods and Supply Chain Matters (Student 5)
3. Describe how Quality Assurance System ensures the best practice in managing the construction
of the development. Propose practical measures that can be utilised by contractors to ensure that the
client achieves a project that is ‘fit for purpose’ and best value for money’.
What is quality assurance.?
What is:- ISO9000 and ISO9001
How will quality be managed on this project .
Will a flow chart assist this question.
How do you achieve a project that’s fit for the purpose?
How do you achieve Best Value for money or best value best practice.
Project Brief – The Millennium Mills Redevelopment
Cities across the world are already feeling the effects of the climate crisis and need to
ensure that they are resilient to a future which could result in a variety of changeable
weather, such as more powerful rainfall events, higher temperatures and sea level rise.
This means that all new developments need to be designed to be resilient in an uncertain
world in 2050 to ensure that the people living, working and visiting there are safe, healthy,
comfortable and productive. Silvertown Quays in London’s Royal Docks is a waterside site
which will be developed over the next 10-15 years and needs to be designed to be 2050-
ready.
The client has already received several proposals regarding the refurbishment of the Mills
but remains unsatisfied with these proposals. Details of the context and background to the
Millennium Mills can be found in Appendix A.
Your team is an engineering consultancy company and has been commissioned by the
lead developer Lendlease to carry out a feasibility study and outline design for the
redevelopment of the Millennium Mills located on the southern side of the Royal Victoria
Dock and associated infrastructure. You will be considering plot 4 for the construction of a
new building to facilitate the client’s requirements below. Basic details, and site plans are
provided on the Moodle site for EG7034 – with further documentary details and materials
accessed online from the Newham London Borough Planning Portal.
Access details of which are in Appendix B.
Project requirements
Lendlease is looking to you for answers as to how to achieve from the project the most
appropriate:
• Sustainable approach to design that will provide long term benefit to the local and
wider area of East London.
• An integrated infrastructure strategy and improved access and transport links for
the local people and businesses.
• A strong commercial strategy & evidence that the development with be financially
viable and meet its legal requirements.
• Demonstrate that they meet the needs of local and regional stakeholders and
environmental planning obligations
• A clear procurement strategy and safe construction programme
5
• A high-quality development that showcases innovation and also provides value for
money for the client and stakeholders alike.
This is broken down in more detail into five (I – V) sections in Part B of this assignment.
Plz, do not accept the question if you are not an expert on ArcMap GIS I need s
Plz, do not accept the question if you are not an expert on ArcMap GIS
I need someone who is an expert on Water Resource planning and ArcMap GIS software.
I need someone who is an expert on Water Resource planning and ArcMap GIS software.
to
Make a Report and PowerPoint presentation for a project.
Project Name: “Water resource planning and management in the Coastal Bend (N) Regional area of Texas with a focus on flood risk assessment and climate change impact assessment”
All the information and description you need are in the attached files (please read the Word file Report template carefully) (And the PDF files for Data reference)
Make a Report and PowerPoint presentation
use ArcMap GIS Software for flood risk assessment And impacts of climate change on water resources in the Coastal Bend (N) Regional area.
Data https://drive.google.com/file/d/1ArR9XiC5FCYHdWew6…