Activity Duration Estimating
1. Discuss the differences between the various duration estimating methods and identify advantages or disadvantages between them.
2. Discuss the primary benefit in three-point duration estimating.
3. Explain the use of contingency estimating.
4. Explain any constraints in using the top-down versus bottom-up approach in duration estimating.
Write a paper of at least 1500 words, typewritten in double-spaced format (12-point font Times New Roman font), page margins Top, Bottom, Left Side and Right Side = 1 inch, with reasonable accommodation being made for special situations and online submission variances. 3 References
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount