Critical Thinking Assignment for Operations Management
Projects are unique, one-time operations designed to accomplish a set of objectives in a limited time frame (Stevenson, 2021).
Think about a project you did recently or a project you will soon work on and detail the following:
Offer a brief explanation of the type of project.
Create a Work Breakdown Structure (WBS) of the project and explain how it will help you with your project.
Present both probabilistic (t0, tp, and tm) and deterministic time estimates and discuss how you arrived at these time estimates.
For each activity, determine hypothetical costs in a table. Include budgeted costs, percent complete, actual/projected cost, and over/under budget (and total). Discuss the rationale for how you derived these costs.
Finally, tell us how the project management tools helped you gain a better vision of the project.
Directions:
Your assignment is required to be five pages in length, which does not include the title page and reference pages, which are never a part of the content minimum requirements.
·
Support your submission with course material concepts, principles,
and theories from the textbook and at least five scholarly,
peer-reviewed journal articles.
·
Formatted according to APA 7th
·
Remember the book in this
course is Stevenson, W. (2021). Operations management (14th ed.). New York, NY:
McGraw-Hill Irwin.
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount