Prepare a report to your supervisor regarding your issues from the situation and any other issues that you think should be reported. Also, include Earned Value calculations for VAC, CPI, EAC (using the remaining formulas not completed last week except the bottoms-up), ETC (no need to re-estimate), TCPI using the BAC formula, and the EAC formula. (Include calculations for all methods of calculating EAC except the bottoms-up.) Although PV, EV, AC, BAC, SV, SPI, and the EAC (using the EAC=AC+BAC-EV formula) were completed last week, include those in your report. WBS report is attached with the completed calculations/information. Just scoll through the tabs on the WBS spreadsheet.
1. Compare the different methods used to calculate EAC and TCPI. Explain why the values differ. Which would you give the most credence in forecasting this project?
2. Explain how you need to control costs on this project. Demonstrate your knowledge of the core value of responsible stewardship by minimizing the cost.
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount