We have completed Deliverable 1 and 2 only in this project, we use https://demo

We have completed Deliverable 1 and 2 only
in this project, we use https://demo.bpmn.io/.
to create the digram.
Deliverable 3 is left which is:
Process analysis and redesign
• Complete a quantitative process analysis, including Cycle Time (CT) and
Cycle Time Efficiency (CTE) calculations.
• Complete a qualitative process analysis, including Value-Added analysis
and Issue Register.
• Propose a “to-be” process model (a redesigned model) using BPMN and
include a descriiption of the proposed process changes. For each
change, explain why you propose it, and what issue(s) it will help solve.
• Include prior work from Deliverables 1 and 2 with corrections.
• Team member contribution and reflection: Each team member must
include a paragraph reflecting on their individual contribution to the
project and what they learned in the process.
here is the feedback on Deliverable 1 and 2 from the instructor
Feedback from instructor
1. Deliverable #1 with correction is missing. You should have included Deliverable #1 work with correction according to the feedback you received.
2. There are a lot of modifications that need to be done in the as-is process model:
The Start Event should be written in this format (noun + past-participle verb), for example: “loan application received”. You should add a label for the End Event.
One of the lanes called “loan processing”? I think you may refer to the finance or accounting department in their company.
The “customer” pool is missing.
The Data objects should be an input or output from an activity (physical or electronic). You need to link your data object to an activity.
“Data Store” is missing, you need to add a data store where Al Maryah Community Bank stores both the loan and customer information.
The use of the different gateways is incorrect.
The text syntax for some of the activities is incorrect. All activities should be written in this format: verb + noun.
Some of the sequence flows are missing labels to clarify the flow of information. And why there is a floating “exception” text in the model?
You should specify what is the estimated waiting time for the “Timer Event” in the model. So instead of “delay resolution”, there should be a more meaningful label.
3. Overall, the as-is model is very simple with very few activities and major issues that you need to consider and correct before your deliverable 3.
you can add the Heuristic Process Redesign from chapter 8 to the business process

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount