Overview: This week’s assignment is to create a work breakdown structure (WBS) f

Overview:
This week’s assignment is to create a work breakdown structure (WBS) for the project
you selected during Unit 2. This is part of your Course Project.
Instructions:
Create a high-level WBS comprised of at least three levels:
Each level should have with a minimum of five level 1 tasks, with two level 2 tasks, and three (3) Level 3 tasks.• Describe each task (work package) in your WBS with just enough information so that everyone in the team can understand what each work package means.• Level Numbering:o Your first level of tasks should be numbered 1.0, 2.0, 3.0, 4.0, and 5.0. o Your second level of tasks should be numbered 1.1, 1.2, 2.1, 2.2, etc., o The third level of tasks should be numbered 1.1.1, 1.1.2, 1.1.3, 1.2.1, 1.2.2. 1.2.3 etc. Requirements:• Submit a Word document. • There is no need to use APA formatting for this assignmentBe sure to read the criteria by which your work will be evaluated before you write

Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount