Instructions
In project management, you will read about and experience what is often referred to as the “triple constraints.” You have likely seen this mentioned in your text and in several previous lessons. Although not formally a PM tool, the triple constraints are a valuable help in maintaining control of project variables. This Collaboration Café will prompt you to explore this important monitor/control concept more deeply.
The triple constraints are often depicted as a triangle. You may see the term “Iron Triangle”. The idea is that, with any project, a change or shift in one side of the triangle necessarily creates changes in either/both of the other sides of the triangle. There are several resources in this week’s lesson that provide additional information and insights on the triple constraints and you are encouraged to review those before posting.
Share your thoughts on that concept and then share which side of the triangle poses the greatest threat of constraint for your project.
** attached is my project ( PICOT)
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount