Answer the following questions with regards to the material learned in this Module (SWPPP). (15 points)
Part 1: Using the Gobernadora Basin Plan sheet from HW2 – see attached (also in HW2) identify and locate on the plan sheet the following BMPs for the project site.
a. Sediment Control
b. Erosion Control
c. Tracking Control
d. Wind Erosion Controls
e. Non-stormwater Controls
f. Waste Management
Label accordingly and include in a PDF attached to the discussion post. Provide neatly drawn BMPs using the map provided. Use Bluebeam, Microsoft Paint, Google SketchUp or neatly draw them by hand. (15 pts)
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount