White Company has two departments, Cutting and Finishing. The company uses job-order costing and computes a predetermined overhead rate in each department. The Cutting Department bases its rate on machine-hours, and the Finishing Department bases its rate on direct labor-hours. At the beginning of the year, the company made the following estimates:
Department
CuttingFinishing
Direct labor-hours7,60089,000
Machine-hours58,3002,800
Total fixed manufacturing overhead cost$ 370,000$ 512,000
Variable manufacturing overhead per machine-hour$ 3.000
Variable manufacturing overhead per direct labor-hour0$4.75
Required:
Compute the predetermined overhead rate for each department.
The job cost sheet for Job 203, which was started and completed during the year, showed the following: Department
CuttingFinishing
Direct labor-hours311
Machine-hours815
Direct materials$ 750$ 380
Direct labor cost$ 66$ 242
Using the predetermined overhead rates you computed in requirement (1), compute the total manufacturing cost assigned to Job 203.
Would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?