Hello Based on the submission of the capstone I need you to create 3 slides to describe the implementation plan of the idea we came up with.
Implementation Phases
Define clear implementation phases to show how your solution will be rolled out. Consider including a pilot phase at a specific land port to test your app and gather initial results. Use benchmarks to estimate improvements and benefits, such as time savings and operational efficiency. Build a high-level business case that outlines:
• Investment required.
• Potential benefits, such as reduced waiting times and enhanced traveler satisfaction.
• A simple cost-benefit analysis to demonstrate the ROI.
Your project has significant potential to address critical challenges and enhance the traveler’s experience at land ports. By refining the “why,” narrowing the scope to a traveler-focused app, incorporating visuals, and leveraging benchmarks, you can create a more compelling and actionable proposal. I look forward to seeing how you incorporate these suggestions into your next steps.
Implementation Plan (3 slides)
Slide 1: Phases of Implementation
• Phase 1: Pilot at a specific land port.
• Phase 2: Data analysis and refinement based on pilot results.
• Phase 3: Full-scale rollout across Saudi Arabia’s land ports.
Slide 2: High-Level Timeline
• Visual timeline showing major milestones for each phase.
Slide 3: Investment vs. Benefits
• Rough estimates of required investment.
• Projected benefits (e.g., economic impact, reduced wait times).
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount