Address the two following issues in a single report:
1. Provide information based on the course readings on the rationale for commissioning building systems. List the building systems that can be potentially included in a commissioning plan. Describe and compare the commissioning requirements and options for commissioning for both LEED v4 and Green Globes. (500 words)
2. Draft up a checklist of contractor requirements in both LEED v4 and Green Globes. Include soil and erosion control, construction indoor air quality, storage of materials, data gathering for credits such as recycled content, low VOC materials, sustainably sourced wood, and other similar requirements. (500 words)
Place this order or similar order and get an amazing discount. USE Discount code “GET20” for 20% discount